Master Engineering Intelligence & Calculation Suite

MEP Engineering Calculators & Statutory Diagnostics

An authoritative computational suite for architects, MEP consultants, facility directors, and contractors. Perform rigorous hydraulic checks, substation sizing, cable voltage drops, clean agent flooding, and statutory NBC 2016 compliance verification in real-time.

Specialized Calculation Modules

Dedicated Engineering Sizing Engines

Select a discipline below to launch dedicated formulas, interactive sliders, Indian Standards citations, and 1-click WhatsApp BOQ exports.

Life Safety

Fire Hydrant & Sprinkler Hydraulics

IS:3844 • IS:15105 • NBC Part 4

Calculate Hazen-Williams pipe friction head loss, residual landing valve nozzle pressure (≥ 3.5 kg/cm²), and fire pump kW rating.

Launch Engine
Mission Critical

Clean Agent Gas Flooding (FM-200 / Novec)

NFPA 2001 • ISO 14520

Size extinguishing agent mass, cylinder quantities, and structural Pressure Relief Damper (PRD) venting for server rooms and data centers.

Launch Engine
Substations

HT/LT Transformer & DG Sizing

IS:2026 • IS:1180 • CEA Regulations

Compute diversity-adjusted maximum demand, 11kV/433V step-down transformer kVA, secondary full-load amps, and standby DG capacity.

Launch Engine
Electrical

LT Cable Sizing & Voltage Drop

IS:7098 Part 1 • IS:1554 • BS:7671

Calculate cable ampacity derating (ambient temp + grouping), route voltage drop percentage, and cross-section requirements for XLPE armoured cables.

Launch Engine
Earthing Grid

Substation & Clean Earth Pit Sizing

IS:3043 • IEEE 80 • CEA Regulations

Determine electrode ground resistance from soil resistivity (ρ), number of parallel chemical earth pits, and GI/Copper strip sizing.

Launch Engine
Plumbing / PHE

Water Sump & Booster Pump Sizing

NBC 2016 Part 9 • CPWD Manual

Calculate per capita LPCD water demand, underground/overhead tank storage split, and VFD hydro-pneumatic booster pump flow and head.

Launch Engine
HVAC / Smoke

Basement Ventilation & Smoke Exhaust

NBC Part 4 Cl. 3.4.6 • ASHRAE 62.1

Size 6 ACH normal carbon monoxide ventilation, 12 ACH emergency fire smoke exhaust CFM, and impulse induction jet fans.

Launch Engine
Standards Library

Interactive BIS Standards & NBC Matrix

BIS • NBC 2016 • CEA • NFPA

Searchable reference library of 40+ statutory Indian Standards covering testing frequencies, mandatory clauses, and equipment specifications.

Launch Engine
Dimensions Matrix

MS & GI Heavy Class Pipe Schedules

IS:1239 Part 1 & 2 • IS:3589

Interactive matrix of outer diameters, wall thicknesses, empty/water-filled weights, and hanger spans from 15mm to 300mm NB.

Launch Engine
Core Tool 01 • Sizing & Budgeting

Interactive MEP & Fire Protection Project Estimator

Configure facility parameters to generate instant pumping capacities, electrical substation load estimations, and empirical turnkey budget windows.

Smart Engineering Sizing Engine

MEP & Fire Protection Project Budget Estimator

Instant preliminary equipment sizing, statutory compliance parameters, and turnkey budget window.

NBC 2016 & DFS Calibrated

Multi-tenant office or IT/ITES hub with high occupant density.

35,000 sq. ft.
Fire Hydrant & Hose Reels
Automatic Fire Sprinklers
Addressable Fire Alarm & PA
HT Substation & LT Panels
PHE, Drainage & Water Supply
24x7 AMC Annual Coverage
Turnkey Budget Estimate₹59.6 – ₹89.5 Lacs
Turnkey Supply & Install
Fire Pump Sizing (NBC Norms)2280 LPM @ 7 kg/cm²Main Electrical + Diesel Standby
Water Storage Required100 KL Static Sump+ 20 KL Terrace Tank
Connected Substation Load~247 kVA Load250 kVA
Est. Delivery Schedule10 – 14 WeeksSurvey to Commissioning
Statutory Approvals & Standard Compliances Included:
✓ NBC 2016 Part 4✓ Delhi Fire Service Act (DFS)✓ CEA Substation Regulations✓ CPWD Plumbing Norms✓ ISO 9001:2015 Execution
Core Tool 02 • Life-Safety Regulatory Audit

NBC 2016 & Delhi Fire Service (DFS) Compliance Diagnostic

Evaluate building height, occupancy class, and basement footprints against statutory Indian Fire Safety norms to identify mandatory equipment.

Statutory Life-Safety Diagnostic

NBC 2016 & Delhi Fire Service NOC Readiness Checker

Identify statutory life-safety equipment required for obtaining your Fire Safety Certificate (FSC / Fire NOC).

DFS • HFS • UPFS Aligned
Statutory Life-Safety Checklist

Mandatory NBC 2016 Requirements

Underground Static Sump1,50,000 Litres (150 KL)
Minimum Pump Flow2280 LPM @ 7.0 kg/cm²
Internal Fire Hydrant & Hose Reel RiserNBC 2016 Cl. 5.1 / IS:3844
Mandatory (Wet Riser)
Automatic Fire Sprinkler SystemIS:15105 / NBC Part 4
Mandatory Across All Floors
External Yard Hydrant Ring Main NetworkIS:13039
Mandatory (Ring 150mm MS)
Diesel Engine Driven Standby Fire PumpNBC Cl. 5.2.2 / IS:12469
Mandatory (100% Secondary Backup)
Addressable Automatic Fire Alarm & PA IntegrationIS:2189 / IS:15908
Mandatory Addressable FAS
Fire Escape Staircase Enclosure & PressurizationNBC Cl. 4.4.2
Two Fire Doors (2-Hr Rated)
Dedicated Fire Command Center & IBMS DeskNBC Part 4 / DFS Rule 33
Integrated Security Desk
Core Tool 03 • Consultant Verification

Institutional Contractor Prequalification Vault

Inspect certified statutory registrations, audited financials, and past performance certificates for procurement evaluation.

Institutional Tender Verification Vault

Contractor Prequalification & Compliance Dossier

Direct access to official certificates, statutory filings, tax registrations, and performance records for PMC consultants, architects, and government tender authorities.

Request Full Tender Pack →
Quality CertificationISO 9001:2015✓ Audited & Certified
Dual GSTIN FilingsDelhi & Haryana✓ Active & Good Standing
MSME ClassificationGovt. of India✓ Udyam Registered
Statutory ManpowerEPFO & ESIC✓ 100% On-Site Compliant
Litigation RecordNIL / Clear✓ Zero Active Disputes
Govt. of IndiaLegal & Statutory

Permanent Account Number (PAN Card)

Proprietorship identification and statutory tax compliance registration.

GSTIN RegisteredLegal & Statutory

Goods & Services Tax (GST) Certificate

Verified GSTIN active status for commercial contracting across India.

Ref: 07ITNPS4205M1ZZ
EPFO CompliantLegal & Statutory

Employees' Provident Fund (EPF) Registration

Statutory PF registration ensuring social security and labour law adherence.

ESIC CoveredLegal & Statutory

Employees' State Insurance (ESIC) Certificate

Comprehensive medical and health insurance coverage for all on-site manpower.

MSME UdyamLegal & Statutory

MSME Udyam Registration Certificate

Recognized MSME enterprise under Govt. of India manufacturing & services class.

Labour LicensedLegal & Statutory

Establishment Registration Certificate (Form C)

Registered establishment under Delhi Shops and Establishments Act.

CA VerifiedFinancial Capability

Declaration Certificate of 3-Year Turnover

Official declaration verifying financial stability and multi-crore execution capacity.

Audited StatementsFinancial Capability

Audited Balance Sheet (AY 2023-2024)

Audited statement of accounts and balance sheet for Assessment Year 2023-2024.

Audited StatementsFinancial Capability

Audited Balance Sheet (AY 2024-2025)

Audited statement of accounts and financial performance for Assessment Year 2024-2025.

Fiscal RecordFinancial Capability

Balance Sheet & Accounts (FY 2025-2026)

Current financial year balance sheet demonstrating active fiscal health.

TATA / VoltasExperience & Certificates

Universal MEP / Voltas Limited Completion Certificate

Completed MEP Works at Data Centre Noida (DC Development Limited, C-20, Sec 62) to best satisfaction.

Ref: WO: 1200025114
Adani ConnexExperience & Certificates

DC Development Noida Ltd. Completion Certificate

Plumbing & Fire Fighting works at Adani Connex Data Center Noida successfully completed.

Ref: WO: 5700351275
DLF Cyber CityExperience & Certificates

Sarvada Building Solutions Completion Certificate

Certified plumbing and fire fighting execution at DLF WeWork Forum Building 1, Cyber City, Gurugram.

Ref: WO: SARV/SGE/24-25/115
Architron GroupExperience & Certificates

Architron Group Completion Certificate

Internal fire fighting & fire alarm works completed to highest satisfaction standards.

Ref: WO: AG/MAL/25/01
Owned AssetsExperience & Certificates

Plant, Machinery & Heavy Equipment Inventory

Complete register of owned grooving machines, threading rigs, pipe cutters, pressure test pumps, and scaffolding.

Full Profile DeckCorporate Deck

SGE Corporate Presentation & Capability Deck (2025)

Comprehensive 2025 presentation deck detailing corporate history, client portfolio, engineering methodology, and credentials.

Need a Custom Engineering BOQ or Authority Representation?

Our senior engineering heads and chief estimators provide tailored hydraulic calculations, electrical SLDs, and statutory fire authority representations.